Industry Case Studies | Successful Supply Chain Consulting | Ncoded
17028
paged,page-template,page-template-blog-masonry,page-template-blog-masonry-php,page,page-id-17028,paged-20,page-paged-20,bridge,,qode-theme-ver-8.0,wpb-js-composer js-comp-ver-6.1,vc_responsive

CASE STUDIES

APS Helps Company Take Bearings

A Preactor 200 FCS tool is now helping Criptic Arvis of Thurmaston, Leicestershire, maintain tight control of its bearings design and manufacturing operation. An interactive electronic planning board, Preactor optimises the balance between demand and capacity, delivering improved efficiencies, better customer service and reduced costs. "We...

APS Gives Lift to Crane Manufacturers Operation

A Preactor 300 FCS tool has replaced the manual wall planning board at Demag Cranes & Components (Mannesmann) – the manufacturer of overhead travelling cranes, hoists and warehouse systems.  The result has been increased production efficiencies due to greater visibility of future planning requirements. Production...

Preactor Gives a Cool Scheduling Solution for Profroid

PROFROID Industries has been manufacturing refrigerating equipment since 1961. Part of the CARRIER SCS Distribution Group, the French factory is located in Aubagne in the south of France. The company initially began in the refrigeration contracting business but rapidly grew into the make to order...

APS Gets Seal of Approval from Destec Engineeirng

Established in 1969 by its current owners, Destec Engineering Ltd has been at the forefront of “Clamp Type Pipe Connectors” design for over 30 years. The company manufactures a range of high pressure fittings used extensively for high pressure Top-Sides, Sub Sea Piping, Manifolds and...